
Continental
Digital
Journey
FIVE
Energy-backed
digital infrastructure,
engineered for performance
CDJ5 develops modular, energy-backed infrastructure across North America, converting stranded and flare gas into reliable power for Bitcoin mining and data operations. Our scalable systems range from 10 MW to 250 MW, combining proven field expertise with next‑generation efficiency.
With over 800 MW of combined installation experience, CDJ5’s founding team brings real energy, real infrastructure, and real results.
The CDJ5 Pillars (Core Framework)
Five integrated disciplines powering every site.
Gas-to-Power
From flare to flow. We secure stranded or flare gas and convert it into stable on-site power through high-efficiency generation systems.
-
Reduces emissions and energy cost per kWh.
-
Enables off-grid energy independence.
Modular Mining
Plug-and-scale infrastructure. Standardized 10–20 MW blocks with optimized cooling and Bitmain S-class miners.
-
Rapid deployment and simplified maintenance.
-
High-density layout for scalability.
HSE & Compliance
Safety drives uptime. ISN-grade safety standards, emissions tracking, and full site monitoring.
Designed for reliability and environmental compliance.
Zero-compromise safety culture.
Economics & Risk
Disciplined operations, predictable returns. Unit-level cost control, flexible lease or revenue-share models, and hedging strategies.
-
Optimized for investor transparency.
-
Stable OPEX with performance-based ROI.
Partnerships
Aligned incentives from ground to cloud. Strategic collaboration with gas and land owners, OEMs, and data-center partners.
-
Shared growth, shared performance.
-
Strong ecosystem for expansion.
About CDJ5
Field-first operators turning energy into performance.
CDJ5 Holdings Ltd. builds energy-backed digital infrastructure across North America. Our team blends four decades of gas-to-power experience with modern digital asset operations, creating a bridge between proven field engineering and emerging blockchain technology.
Founded by industry veterans from Atlas Power & Compression, CDJ5 combines deep mechanical expertise, disciplined operations, and transparent financial structures. Every project reflects our guiding principles: reliability, safety, scalability, and integrity.
From flare gas to future-ready infrastructure—CDJ5 transforms resources into results.
How It Works (Process)
From Gas to Hashrate — End to End
A proven five-step framework turning stranded gas into digital value.

Source & Analyze Gas
We assess composition, logistics, and regulatory parameters to identify viable options for flare or stranded gas, as well as pipeline gas. Every project starts with measured flow data and environmental review.
01

Engineer & Deploy Power Systems
CDJ5 integrates high-efficiency generation packages, emissions control, and site infrastructure tailored to gas characteristics. Each block is engineered for 97% runtime. Higher % runtime achievable with battery backup or grid tie-in.
02

Install Mining & Cooling Modules
Modular containers arrive pre-configured with miners, switchgear, and network controls for rapid assembly. Scalable from 10–20 MW per site.
03

Commission, Monitor & Maintain
Real-time telemetry, predictive analytics, and on-site field crews ensure performance meets safety and uptime standards. Sites are remotely visible through the CDJ5 dashboard.
04

Scale & Optimize
As performance data accumulates, additional capacity can be added with minimal downtime. CDJ5’s playbook standardizes procurement, EPC, and operations for faster replication.
05
Performance & Capacity
Highlight measurable outcomes rooted in decades of prior field success. CDJ5 leverages the operational history and technical excellence of its founding team—work originally executed under Atlas Power & Compression—to deliver scalable, modern energy-backed solutions today.
Installed Capacity
800+ MW deployed across partner projects
Proven performance in both power and mining applications.
Runtime Reliability
98% Uptime achieved on mature fleets
Operational excellence built through predictive maintenance.
Site Deployment
10+ Crypto-Mining Sites deployed and online
Transforming flare gas into clean, high-value digital energy.
Modular Equipment
100+ Gensets installed and serviced
Flexible 10–250 MW capacity for scalable growth.
Wild Rose Mining
Strategic collaborator supporting site development, resource integration, and operational execution.
Several Gas Providers
Key upstream partners supplying stranded and flare gas streams for power generation.
Atlas Power & Compression
Primary engineering and service backbone for North American sites.
Bitmain
Leading-edge miners integrated into modular CDJ5 containers for optimal density and power utilization.
Ariel
Compression solutions engineered for consistent throughput and efficiency.
Waukesha & Caterpillar
Prime movers and engines delivering 95%+ runtime under real-world conditions.
Partners & OEMs
CDJ5 aligns with industry leaders who share our commitment to reliability, performance, and safety. Our partner network extends across generation, compression, cooling, and data infrastructure—ensuring that every deployment meets the highest standards.
